Common Description
Outfitted with all the zero leak bidirectional checking sole-noid valves, this energy unit is designed for your operation of two independent circuits. Which are respectively for your primary and subordinate platforms in the double scissors lift. Two cut-off valves are used for decreasing the machine manually in case of energy reduction. If extra independent circuits are needed for your application please get in touch with us for availability.
Remark: 1. Please check with our income engineer for that distinct pump displacement, motor power or tank capacity.
two. CSA or UL certified motors are available upon request.
Exclusive Notes
1. The AC motor is of S3 duty cycle, which may only work intermittently and repeatedly, i.e., 1minute on and 9 minutes off.
two. Clean all of the hydraulic parts concerned ahead of installation of the electrical power unit.
3. Viscosity of the oil shoud be 15~46 cst,and the oil need to be clean and free of impurities,N46 hydraulic oil is suggested.
4. The energy unit must be mounted vertically.
five. Check the oil level from the tank immediately after the first working of the energy unit.
six. Oil shifting is needed following the initial a hundred operation hrs,afterwards as soon as every single 3000 hrs.